The Hidden Challenges of EV Infrastructure Deployment
Electrifying commercial fleets is not as simple as installing chargers and plugging in. Behind the scenes, fleets must navigate a web of logistical, financial, and operational hurdles that can slow deployment and impact long-term success. In a recent discussion, industry experts from Voltera and ChargerHelp shed light on what many fleet operators and stakeholders aren’t being told about EV infrastructure.
From power availability to long-term planning, here’s what you need to know.
1. Power Availability: It’s Not a Given
One of the biggest misconceptions about EV infrastructure is that power will be readily available wherever it is needed. The truth is that power capacity at a given location depends on multiple factors, including:
- Grid limitations: Some areas lack the electrical infrastructure to support high-power charging.
- Interconnection delays: Getting utility approval and the necessary upgrades can take years.
- Competing energy demands: Utilities balance EV charging needs with broader grid demands.
- Local variability: Power availability isn’t just a broad grid issue, it varies significantly by location, making site selection even more critical.
What This Means for Fleets:
Planning ahead is critical in the EV infrastructure industry! Site selection should factor in grid capacity and potential delays in power upgrades. Engaging with utilities early can help mitigate setbacks, but fleets should also be prepared for unexpected delays and hidden bottlenecks in securing power.
One key takeaway from the discussion: Even when power is technically available, the infrastructure to deliver it to your site may not be in place. If transmission or distribution upgrades are needed, this can add years to project timelines. Fleets need contingency plans for power availability, including evaluating alternative locations and temporary charging solutions where necessary.
2. Short-Term Thinking Can Be Costly
A common pitfall in EV infrastructure planning is focusing only on immediate needs rather than long-term scalability. Experts emphasized that fleets often underestimate:
- Future energy demands: As fleet sizes grow, charging needs will increase.
- Technology advancements: Newer vehicle models may require different charging solutions.
- Operational flexibility: Charging sites should be adaptable to changes in fleet routing and energy costs.
- The risk of stranded assets: Poorly planned charging sites may become obsolete if they don’t align with long-term fleet needs.
The Key Takeaway:
An EV infrastructure plan should be built for growth, not just today’s needs. Investing in scalable solutions now can prevent costly redesigns later.
Many fleets make the mistake of assuming their current vehicles and charging needs will remain constant. In reality, newer EV models will demand higher power levels, different connector types, and more advanced energy management. Future-proofing infrastructure by designing for flexibility and scalability can prevent expensive modifications down the line.
Additionally, energy prices fluctuate, and fleets should factor in dynamic electricity pricing, grid constraints, and peak demand charges when planning for long-term electrification.
3. Site Development Takes More Than Just Chargers
Successful EV infrastructure sites require careful consideration of more than just charging hardware. Key factors include:
- Land use and permitting: Zoning laws and local regulations can slow development.
- Traffic flow and accessibility: Sites must be designed to avoid bottlenecks and accommodate large vehicles.
- Energy management: Load balancing and storage solutions can optimize charging efficiency and costs.
- Utility timelines: Even if you have a location selected, infrastructure upgrades by utilities don’t happen overnight and can delay operations significantly.
Why This Matters:
Ignoring these elements can lead to inefficiencies, delays, and unexpected costs. Working with experienced partners who understand site development, like Voltera, can streamline the process.
A critical insight from the discussion: Fleets must consider their operational model when designing charging sites. If vehicles rely on depot-based overnight charging, infrastructure should be designed with adequate power distribution for simultaneous charging. If vehicles require en-route charging, charging hubs with high power capacity must be strategically placed along key routes.
This is why an incremental, phased approach can work best. Rather than electrifying an entire fleet at once, many operators start with a pilot project, refine their approach, and scale up based on data and operational feedback.
4. Hidden Costs Can Impact ROI
While the push for electrification is strong, fleets need to be mindful of the financial realities. Beyond charger installation, costs can include:
- Utility demand charges: High electricity usage during peak hours can lead to expensive fees.
- Ongoing maintenance: Chargers and electrical infrastructure require regular upkeep.
- Software and data management: Smart charging solutions add costs but improve efficiency.
- Infrastructure incentives: Grants and funding programs exist, but they are not guaranteed and may not cover all costs.
- Downtime costs: Unplanned charger failures can disrupt operations and impact revenue.
A Smarter Financial Approach:
Fleets should consider all cost factors, not just initial investment. Understanding the total cost of ownership (TCO) helps in making informed decisions.
One of the most overlooked cost factors? Energy management strategies. Smart charging solutions that schedule charging during off-peak hours or integrate onsite energy storage can help fleets avoid peak demand charges, lowering operational costs.
Additionally, EV infrastructure downtime can be costly. If chargers fail and vehicles can’t charge, entire fleet operations can grind to a halt. Proactive maintenance and remote monitoring are essential to ensuring infrastructure reliability.
Ready to Take the Next Step?
As you can see, EV infrastructure deployment comes with challenges that aren’t always obvious at first glance. Power constraints, long-term planning, site development complexities, and financial considerations all play a role in determining success.
Fleets that take a proactive, informed approach—working with experts and planning for the future—will be better positioned for a smooth and scalable transition to electrification.
Voltera’s expertise in EV infrastructure deployment can help you develop a scalable, cost-effective charging strategy.
Get insightful guidance on infrastructure planning tailored to your fleet’s needs.
Talk to Our Team
Dive deeper into key considerations for EV deployment.
Download Playbook 5
Hear directly from industry experts on the challenges and solutions involved in this process.
Watch our Webinar on the Topic
Start your journey today!